VW Touareg repair


+ 1. Operation and car maintenance
+ 2. Engine
+ 3. Transmission
+ 4. Running gear
+ 5. Steering mechanism
+ 6. Brake system
- 7. Onboard electric equipment
   + General information
   - Generator and starter
      Removal and starter installation (6-цил. the engine with injection of 3,2 l and the engine of 3,6 l of FSI, AKPP)
      Removal and starter installation (8-цил. the engine with injection of 4,2 l, AKPP)
      Removal and starter installation, 10-tsil. TDI engine of 4,9 l, AKPP
      Three-phase generator
      Removal and installation of the three-phase generator, with air cooling, 6-цил. the engine with injection
      Removal and installation of the three-phase generator, 8-цил. the engine with injection
      Removal and installation of a regulator of tension
   + Combination of devices
   + Forward screen wiper
   + Headlights
   + Tables
+ 8. Body
+ electric equipment Schemes



Volkswagen Touareg / Touareg repair>> Onboard electric equipment>> Generator and starter>> Removal and starter installation, 10-tsil. TDI engine of 4,9 l, AKPP
Removal
Remove the engine.
Remove the right turbonagnetatel.

Fig. 7.40 . Thermal insulation of the magnetic switch


Open buttons and remove a thermal insulation of the magnetic switch (fig. 7.40) .

Fig. 7.41 . Nut of fastening of an arm of the engine


Turn off a nut from an engine arm (fig. 7.41) .

Fig. 7.42 . A shipping eye in a back part to the right GBTs


Fasten a shipping eye T10126 1 by means of a bolt M8х40 2 in a back part to the right GBTs (fig. 7.42) .

ATTENTION
The thorn of a shipping plate should get when fastening to a special opening of the holder fixed on the engine.


Fig. 7.43 . A shipping eye in a forward part of the left GBTs


Fasten a shipping eye of T10126/1 1 by means of a bolt M8х40 2 in front to the left GBTs (fig. 7.43) .

ATTENTION
The thorn of a shipping plate should get when fastening to a special opening of the holder fixed on the engine.

Suspend the adaptation for posting 3033 to the VAS 6100 crane.
Suspend shipping eyes of T10126 and T10126/1 to the adaptation for posting 3033.
Lift the engine by means of the VAS 6100 crane.

Fig. 7.44 . Fastening of the right support


Turn off 4 fixing bolts of M10х95 of the right support of the engine and remove the right support (fig. 7.44) .

Fig. 7.45 . A fixing bolt of a tube of system of cooling on the block of cylinders of the engine


Unscrew a fixing bolt of a tube of system of cooling on the block of cylinders of the engine (fig. 7.45) .

Fig. 7.46 . A fixing bolt of a tube of system of cooling on a transmission


Unscrew a fixing bolt of a tube of system of cooling on a transmission (fig. 7.46) .

Fig. 7.47 . Protective cap


Remove a protective cap from the electromagnetic switch of a starter (fig. 7.47) .

Fig. 7.48 . Fixing nut of a plusovy cable of the electromagnetic switch of a starter


Turn off a fixing nut of a plusovy cable from the electromagnetic switch of a starter (fig. 7.48) .

Fig. 7.49 . Fixing nut of the plug of a cable 50 electromagnetic switches of a starter


Turn off a fixing nut of the plug of a cable 50 from the electromagnetic switch of a starter (fig. 7.49) .

Fig. 7.50 . Fixing bolt of the holder of cables


Unscrew a fixing bolt of the holder of cables and put cables aside (fig. 7.50) .

Fig. 7.51 . Bottom fixing bolt of a starter


Unscrew the bottom fixing bolt of a starter of M12х165 on the engine party (fig. 7.51) .

Fig. 7.52 . Top fixing bolt of a starter


Unscrew the top fixing bolt of a starter of M12х165 on the transmission party (fig. 7.52) .
Take a starter.

Installation
Installation is carried out in return sequence, thus it is necessary to consider the following.
Tighten connections with the ordered moment of an inhaling (see tab. 7.2).


<