VW Touareg repair


+ 1. Operation and car maintenance
- 2. Engine
   + Preliminary checks on the car
   + Mechanical part (petrol engines 3,2L)
   + Mechanical part (petrol engines 4,2L)
   + Mechanical part (diesel engines 5,0L)
   + Removal and stretcher installation
   + pressurization System (diesel engines)
   - Cooling system (petrol engines)
      Removal and installation of elements of system of cooling
      Plums and the gulf of cooling liquid
      Removal and radiator installation
      Removal and installation of the water pump
   + cooling System (diesel engines)
   + greasing System (petrol engines)
   + greasing System (diesel engines)
   + injection System (petrol engines)
   + injection System (diesel engines)
   + System of production of the fulfilled gases
   + System топливоподачи (beninovy engines)
   + Tables
+ 3. Transmission
+ 4. Running gear
+ 5. Steering mechanism
+ 6. Brake system
+ 7. Onboard electric equipment
+ 8. Body
+ electric equipment Schemes



Volkswagen Touareg / Touareg repair>> Engine>> Cooling system (petrol engines)>> Removal and installation of elements of system of cooling
ATTENTION
When opening a broad tank it can leave hot steam. to avoid a travmirovaniye of eyes and an oshparivaniye, to put on goggles and special clothes. To cover a cover of a bull-calf with rags and accurately to open it.

ATTENTION
At any installation works, in particular in a motor compartment because of dense configuration, it is necessary to consider the following.
(For example fuel, hydraulic, an absorber with absorbent carbon, systems of cooling, central air contour, pipelines of brake system, vacuum hoses), and also electric wires it is necessary to lay highways of all types how they were laid initially.

Provide free space for all mobile and hot components.

NOTE
Shlangovye connections are fixed by spring collars. At repair use only spring collars.


Fig. 2.227 . Pincers for spring collars


For installation of spring collars it is recommended to use pincers for spring collars of VAS of 5024 A (fig. 2.227) .
At installation lay hoses of system of cooling, on pulling them. Track, that they did not concern other components (observe marking on a branch pipe of a radiator and a hose).

Elements of system the coolings established on a body

Fig. 2.228 . Elements of system the coolings established on a body: 1–the pump of circulation of cooling V51 liquid; 2–a hose of cooling liquid; 3–a hose of cooling liquid; 4–from a radiator; 5–broad tank; 6–cover; 7–a hose of cooling liquid; 8–a hose of cooling liquid; 9–to the heater heat exchanger; 10-from the heat exchanger of system of heating; 11-to the thermostat case


ATTENTION
At any installation works, in particular in a motor compartment because of dense configuration, it is necessary to consider the following.
(For example fuel, hydraulic, an absorber with absorbent carbon, systems of cooling, central air contour, pipelines of brake system, vacuum hoses), and also electric wires it is necessary to the highway of all types lay how they were laid initially.
In particular when laying hoses of system of cooling and to avoid damages, it is necessary to pay attention to existence of sufficient space between hoses, and also with all mobile or hot elements.


Pump installation site выбега cooling V51 liquid

Fig. 2.229 . A pump installation site выбега cooling V51 liquid


The pump of circulation of cooling liquid V51 2 is assigned to GBTs under the electromagnetic valve of 1 absorber with N80 absorbent carbon dempfiruyushchy rings to an arm.

Thermostat case

Fig. 2.230 . Scheme of installation of the case of the thermostat: 1–sealing ring of round section; 2–fixing bracket; 3–thermostat case; 4–bolt of 8 N · m; 5–thermostat; 6–connecting branch pipe; 7–sealing ring; 8–the sensor of temperature of cooling G62 liquid; 9–stopper


Provide free space for all mobile and hot components.

ATTENTION
At any installation works, in particular in a motor compartment because of dense configuration, it is necessary to consider the following.
(For example fuel, hydraulic, an absorber with absorbent carbon, systems of cooling, central air contour, pipelines of brake system, vacuum hoses), and also electric wires it is necessary to the highway of all types lay how they were laid initially.

Plan of connection of hoses of system of cooling

Fig. 2.231 . Scheme of connection of hoses of system of cooling: 1–radiator; 2–oil cooler; 3–head of the block of cylinders; 4–broad tank; 5–thermostat case; 6–heat exchanger of system of heating; 7–the pump of circulation of cooling V51 liquid; 8–oil cooler; 9–a hose of cooling liquid, top; 10-a tube of supply of cooling liquid; 11-block of cylinders; 12-a hose of cooling liquid, bottom; 13-water pump


The scheme of connection of hoses of system of cooling is shown on fig. 2.231 .


<