VW Touareg repair


+ 1. Operation and car maintenance
- 2. Engine
   + Preliminary checks on the car
   + Mechanical part (petrol engines 3,2L)
   + Mechanical part (petrol engines 4,2L)
   + Mechanical part (diesel engines 5,0L)
   + Removal and stretcher installation
   + pressurization System (diesel engines)
   + cooling System (petrol engines)
   - Cooling system (diesel engines)
      Removal and installation of fastening of the fan
      Removal and radiator installation
      Removal and installation of unions of system of cooling
      Removal and installation of the water pump
   + greasing System (petrol engines)
   + greasing System (diesel engines)
   + injection System (petrol engines)
   + injection System (diesel engines)
   + System of production of the fulfilled gases
   + System топливоподачи (beninovy engines)
   + Tables
+ 3. Transmission
+ 4. Running gear
+ 5. Steering mechanism
+ 6. Brake system
+ 7. Onboard electric equipment
+ 8. Body
+ electric equipment Schemes

Газорегуляторный пункт шкафной грпн.


Volkswagen Touareg / Touareg repair>> Engine>> Cooling system (diesel engines)>> Removal and installation of unions of system of cooling
Removal
Merge cooling liquid.
Remove hoses of system of cooling from unions.
Disconnect the tip from the sensor of temperature of cooling G62 liquid.
Unscrew fixing bolts of the union of system of cooling.

Fig. 2.246 . Installation of a connector of cylinders in the union of system of cooling


Push connectors of cylinders in the arrow direction in the union of system of cooling 1 (fig. 2.246) .

Installation
Installation is carried out in return sequence, thus it is necessary to consider the following.
Replace consolidations 2 and sealing rings.
Tighten fixing bolts of the union of system of cooling 1 with the moment of 8 N · m.
Fill in cooling liquid.


<