VW Touareg repair+ 1. Operation and car maintenance - 2. Engine - Preliminary checks on the car Survey on lack of negermetichnost and damages Check of a condition of a poliklinovy belt Removal and installation of a poliklinovy belt (the petrol engine 4,2L) Removal and installation of a poliklinovy belt (the petrol engine 3,2L) Check of pulleys of a belt drive on a distortion (the petrol engine 4,2L) Removal and installation of the bottom shumoizolyatsionny screen of a motor compartment Removal and installation of the top casing of the engine Compression check (the petrol engine 3,2L) Compression check (the diesel engine 5,0L) + Mechanical part (petrol engines 3,2L) + Mechanical part (petrol engines 4,2L) + Mechanical part (diesel engines 5,0L) + Removal and stretcher installation + pressurization System (diesel engines) + cooling System (petrol engines) + cooling System (diesel engines) + greasing System (petrol engines) + greasing System (diesel engines) + injection System (petrol engines) + injection System (diesel engines) + System of production of the fulfilled gases + System топливоподачи (beninovy engines) + Tables + 3. Transmission + 4. Running gear + 5. Steering mechanism + 6. Brake system + 7. Onboard electric equipment + 8. Body + electric equipment Schemes |
Volkswagen Touareg / Touareg repair>> Engine>> Preliminary checks on the car>> Removal and installation of the top casing of the engine Removal of the right lateral casing of the engine
Uncover 2.
Remove an engine casing from fastenings (an arrow in
drawing 2.10
) and take it up.
Removal of the central casing of a motor compartment (the 6-cylinder petrol engine)
Rasklipsuyte engine 1 and 2 casings also take them up
(fig. 2.11)
.
Removal of the central casing of a motor compartment (the 10-cylinder diesel engine)
Take щуп 2 measurements of level of oil.
Otklipsuyte a casing 1 from fastenings (an arrow in
drawing 2.12
) also remove it up.
Installation
Establish an engine 1 casing on points of fastening and press it so that clamps were latched.
Do not forget to establish maslomerny щуп.
Removal of the central casing of a motor compartment (the 6-cylinder diesel TDI Common Rail engine)
At first remove an engine casing both hands ahead (concerning the movement direction) (shooters in
drawing 2.13
), then raise it both hands behind (in a zone of a wall of a motor compartment).
Installation
Arrange an engine casing on fastening points, pay attention on maslozalivny a branch pipe and maslomerny щуп.
Press an engine casing in fastening points in front and behind so that clamps were latched.
|
< |