VW Touareg repair+ 1. Operation and car maintenance + 2. Engine + 3. Transmission + 4. Running gear + 5. Steering mechanism + 6. Brake system - 7. Onboard electric equipment + General information - Generator and starter Removal and starter installation (6-цил. the engine with injection of 3,2 l and the engine of 3,6 l of FSI, AKPP) Removal and starter installation (8-цил. the engine with injection of 4,2 l, AKPP) Removal and starter installation, 10-tsil. TDI engine of 4,9 l, AKPP Three-phase generator Removal and installation of the three-phase generator, with air cooling, 6-цил. the engine with injection Removal and installation of the three-phase generator, 8-цил. the engine with injection Removal and installation of a regulator of tension + Combination of devices + Forward screen wiper + Headlights + Tables + 8. Body + electric equipment Schemes |
Volkswagen Touareg / Touareg repair>> Onboard electric equipment>> Generator and starter>> Removal and starter installation (8-цил. the engine with injection of 4,2 l, AKPP)
Removal
Remove the engine.
Remove a final collector.
Turn off a fixing bolt 1.
Unblock a cable 2 and remove the holder of cables 3 from an engine arm
(fig. 7.32)
.
Turn off a fixing nut from an engine pillow
(fig. 7.33)
.
Unscrew fixing bolts
(fig. 7.34)
.
Suspend the engine to the adaptation for posting 3033 from the right GBTs (the party of a gear belt) and the left GBTs (the flywheel party).
Suspend the adaptation for posting 3033 to the VAS 6100 crane.
Lift the engine by means of the VAS 6100 crane
(fig. 7.35)
.
Take an engine pillow.
Turn off all three fixing bolts of an arm of the engine at the block of cylinders.
Remove an engine arm.
Remove protective caps
(fig. 7.36)
.
Turn off fixing nuts of the plug of a cable 50 1 and a plusovy cable 2 from the magnetic switch of a starter
(fig. 7.37)
.
Put wires aside.
Unscrew the bottom fixing bolt of a starter on the engine party
(fig. 7.38)
.
Unscrew the top fixing bolt of a starter on the transmission party
(fig. 7.39)
.
Take a starter.
Installation
Installation is carried out in return sequence, thus it is necessary to consider the following.
Tighten connections with the ordered moment of an inhaling.
|
< |