VW Touareg repair+ 1. Operation and car maintenance - 2. Engine + Preliminary checks on the car + Mechanical part (petrol engines 3,2L) + Mechanical part (petrol engines 4,2L) + Mechanical part (diesel engines 5,0L) + Removal and stretcher installation + pressurization System (diesel engines) + cooling System (petrol engines) + cooling System (diesel engines) + greasing System (petrol engines) + greasing System (diesel engines) + injection System (petrol engines) - Injection system (diesel engines) Check and adjustment of position of pistons pump nozzles Removal and installation of an inlet collector Removal and installation pump nozzle Replacement of sealing rings of round section pump nozzle + System of production of the fulfilled gases + System топливоподачи (beninovy engines) + Tables + 3. Transmission + 4. Running gear + 5. Steering mechanism + 6. Brake system + 7. Onboard electric equipment + 8. Body + electric equipment Schemes |
Volkswagen Touareg / Touareg repair>> Engine>> Injection system (diesel engines)>> Removal and installation of an inlet collector
Conditions (cars with alphabetic references of the engine AYH, BKW)
The fuel pump should be dismantled.
Cars with BLE and BWF engines
The bypass cover with a radiator of system of a retsirkulyatsiya of OG should be dismantled.
Continuation of assembly operations for all cars
The top part of a cover of the case should be dismantled.
For removal of an inlet collector without dismantle of a fuel stage, it is necessary to take bolts of an inlet collector completely.
|
< |