VW Touareg repair


+ 1. Operation and car maintenance
+ 2. Engine
+ 3. Transmission
+ 4. Running gear
- 5. Steering mechanism
   - Repair of the steering mechanism
      Removal and installation of a steering column
      Removal and installation of a sealing cuff
      Removal and installation of a drive of the amplifier of a steering
      Removal and installation of steering draft
      Krylchaty pump, 5-цил. diesel engine
      Removal and installation of the krylchaty pump, 5-цил. diesel engine
      Removal and installation of the krylchaty pump, 6-цил. diesel engine
      Removal and installation of the krylchaty pump (6-цил. petrol engine)
      Pumping of system of a steering and check on tightness
      Check of system of a steering on tightness
+ 6. Brake system
+ 7. Onboard electric equipment
+ 8. Body
+ electric equipment Schemes



Volkswagen Touareg / Touareg repair>> Steering mechanism>> Repair of the steering mechanism>> Removal and installation of the krylchaty pump, 5-цил. diesel engine

Fig. 5.21 . Components of the krylchaty pump: 1–block of cylinders; 2–sealing ring; 3–krylchaty pump; 4–bolt; 5–coupling; 6–spring collar; 7–a soaking-up hose; 8–sealing rings, 16х22; 9–pressure head pipeline; 10-hollow bolt, 35 N · m


NOTE
Replace sealing rings.
The merged oil any more do not use.


Removal
Remove the shumoizolyatsionny screen of the engine
Remove a connecting hose of a cooler of nadduvochny air
Remove the left podkrylok

Fig. 5.22 . Nut of fastening of a collar of the pipeline


Turn off a nut of a collar of the pipeline of the conditioner about a cooler of nadduvochny air 1 (fig. 5.22) .
Remove the case of the air filter

Fig. 5.23 . Noise isolation removal


Remove a noise isolation 1 from the engine (fig. 5.23) .

Fig. 5.24 . Installation of the holder


Establish on the engine the holder of T10109 (fig. 5.24) .
Remove the compressor of the conditioner and to put aside.

Fig. 5.17 . The adaptation for a hose perezhatiya


Press soaking-up hose 1 by means of a clip for hoses 3094 (fig. 5.17) .
Unscrew a hollow bolt 2.
To close the pressure head pipeline polyethylene or etc.
Open a spring collar and remove soaking-up hose 1 from the krylchaty pump.

Fig. 5.25 . Damper


Remove a damper from an engine arm (fig. 5.25) .

Fig. 5.26 . Console installation


Establish support console for the engine of 10-222 A with adapters 10-222 A/3, 10-222 A/8 and 10-222 A/19 (fig. 5.26) .
Establish adapters 10-222 A/19 on longerons.
Watch to damaging the conditioner 1 pipeline at adapter installation.

Fig. 5.27 . Rotation of adapters


Rotate adapters until they will not accept loading from the unit and the left support of the engine (fig. 5.27) will not be unloaded .
Adapters 10-222 A/8 serve only for capsizing prevention.
Disconnect the socket under an engine arm.

Fig. 5.28 . Arm fastening


Turn off bolts of an arm of the engine and take an arm (fig. 5.28) .

Fig. 5.29 . Fastening of the krylchaty pump


Turn off bolts and take the krylchaty pump 1 of the block of cylinders (fig. 5.29) .

Installation
Installation is carried out in return sequence, thus it is necessary to consider the following.
Fill the krylchaty pump with oil for hydrosystems. Oil fill in through soaking-up branch pipe of the krylchaty pump.
Turn a nave by hand until oil does not leave on the pressure head party.
Establish the krylchaty pump.
Pump over steering system.
Check level of working liquid in the hydraulic. to system.
Check steering system on tightness.

Inhaling moments
The Krylchaty pump to the block of cylinders – 40 N · m + 90 °.
Hollow bolt to the krylchaty pump – 35 N · m.
Engine arm to the block of cylinders – 55 N · m.
Damper to an engine arm/support – 75 N · m.


<