VW Touareg repair


+ 1. Operation and car maintenance
- 2. Engine
   + Preliminary checks on the car
   + Mechanical part (petrol engines 3,2L)
   + Mechanical part (petrol engines 4,2L)
   + Mechanical part (diesel engines 5,0L)
   - Removal and stretcher installation
      Removal and installation of pillows and engine support (right and left)
      Removal and installation of a conducted disk
      Removal and installation of a stage of support of a cranked shaft
      Forward sealing laying of a flange and damper of krutilny fluctuations
      Replacement of an epiploon of a cranked shaft on the party of a damper of krutilny fluctuations
      Replacement of an epiploon of a cranked shaft on the party of the mechanism of a gazoraspredeleniye of the engine
      Replacement of an epiploon of a shaft of a drive of the generator
      Installation of a cover of the distributive mechanism
      Removal and installation of a leading gear wheel of a camshaft
      Check of phases of a gazoraspredeleniye
      Adjustment of phases of a gazoraspredeleniye
      Removal and installation of heads of the block of cylinders
      Removal and installation of covers and laying of heads of the block of cylinders
      Repair of heads of the block of cylinders
   + pressurization System (diesel engines)
   + cooling System (petrol engines)
   + cooling System (diesel engines)
   + greasing System (petrol engines)
   + greasing System (diesel engines)
   + injection System (petrol engines)
   + injection System (diesel engines)
   + System of production of the fulfilled gases
   + System топливоподачи (beninovy engines)
   + Tables
+ 3. Transmission
+ 4. Running gear
+ 5. Steering mechanism
+ 6. Brake system
+ 7. Onboard electric equipment
+ 8. Body
+ electric equipment Schemes



Volkswagen Touareg / Touareg repair>> Engine>> Removal and stretcher installation>> Forward sealing laying of a flange and damper of krutilny fluctuations
Tighten fixing bolts in the shown sequence with the moment of 8 N · m.

Fig. 2.172 . Forward sealing laying of a flange and damper of krutilny fluctuations: 1–forward sealing laying of a flange; 2–bolt of 8 N · m; 3–cover of the water pump; 4–damper of krutilny fluctuations; 5–a bolt of 50 N · m + to tighten on 1/4 about. (90 °); 6–washer; 7–sealing ring; 8–bolt of 13 N · m


Fig. 2.173 . Sequence of an inhaling of fixing bolts of a forward sealing flange and cover of the water pump




<