VW Touareg repair+ 1. Operation and car maintenance + 2. Engine - 3. Transmission + 6-step automatic transmission 09D + hydrotransformer Check - Mechanical transmission 08D and transfer case Е473 Marking of a transfer case Marking of forward main transfer Marking of reverse main gear General instructions Electric / electronic components and places of their installation on a transfer case Removal and installation of governing body of a transfer case of E473 Removal and installation of the control unit of a transfer case of J646 Removal of a transfer case Installation of a transfer case Laying of a ventilating tube on a transfer case Replacement of a rezinometallichesky support of an arm of a transmission Check of level of oil in a transfer case Removal and installation of sealing rings of a flange of a shaft of selection of capacity/driveshaft and electric motor of a transfer case Replacement of a sealing ring of a flange of a shaft of selection of capacity / the back driveshaft (the transfer case is established) Removal of the electric motor of a transfer case of V253 Installation of the electric motor of a transfer case of V253 Check of level of oil in the main transfer of a forward axis + Driveshaft + Driving mechanism + Tables + 4. Running gear + 5. Steering mechanism + 6. Brake system + 7. Onboard electric equipment + 8. Body + electric equipment Schemes |
Volkswagen Touareg / Touareg repair>> Transmission>> Mechanical transmission 08D and transfer case Е473>> Removal and installation of sealing rings of a flange of a shaft of selection of capacity/driveshaft and electric motor of a transfer case
Fix a transfer case at the assembly stand bolts
(fig. 3.108)
.
Vypressuyte metal boot
(fig. 3.109)
.
A–Stripper of 22-115 mm, for example, Kukko 17/2.
Press a metal boot And against the stop
(fig. 3.110)
.
Take a sealing ring of a flange of a shaft of selection of capacity / the back driveshaft.
In
drawing 3.111
removal of a sealing ring of a flange of a shaft of selection of capacity / the back driveshaft is shown.
The course of works on removal of a sealing ring of a flange of a shaft of selection of capacity / the forward driveshaft is similar.
Press a sealing ring of a flange of a shaft of selection of capacity / the back driveshaft
(fig. 3.112)
.
Fill space between working and antidust edges of consolidation half plastic A1 G 052 128 greasing.
Establish a sealing ring of round section in a flute of primary shaft.
Press a metal boot And against the stop
(fig. 3.110)
.
Press a sealing ring of a flange of a shaft of selection of capacity / the forward driveshaft.
Fill space between working and antidust edges of consolidation half plastic G 052 128 A greasing
(fig. 3.112)
.
Remove a ventilating tube And.
Establish an opravka In with O of 5 mm in an opening of a ventilating tube.
To move a ventilating tube And in the arrow direction, at the same time raise it by means of a screw-driver With and take a ventilating tube from a transfer case
(fig. 3.113)
.
Press a ventilating tube
(fig. 3.114)
.
Grease before a press fitting a ventilating tube a varnish for Loctite 648 fixing.
Way of repair at replacement of the electric motor of a transfer case of V253 and at the faulty sensor of temperature of G8 oil
At replacement of the electric motor of a transfer case of V253 and at malfunction of the sensor of temperature of oil 4 it is necessary replace the sensor of temperature of oil (with a sealing ring 3) through a carving stopper 1 with a sealing ring 2
(fig. 3.115)
.
Dismantling of a plait of wires of the sensor of temperature of G8 oil occurs in the following order.
Remove the holder of 1 tip of the electric motor of a transfer case, for this purpose unscrew bolts.
Take the 10-contact tip 2 of the holder
(fig. 3.116)
.
Take wires 1 and 2 10-contact tips by means of the suitable tool from a set for repair of cables of VAS 1978.
Disconnect a plait of wires 3 sensors of temperature of oil
(fig. 3.117)
.
Close openings for wires of the 10-contact tip 1 and 2 by means of a suitable cap.
Replacement of a sealing ring of a flange of a shaft of selection of capacity / the forward driveshaft (the transfer case is established)
Removal
Remove the forward driveshaft.
Fix a countersupport 3145 2 bolts of M10x25 on a flange of a shaft of selection of capacity
(fig. 3.118)
.
Turn off nuts of a flange of a shaft of selection of capacity.
Remove a flange of a shaft of selection of capacity.
Remove a sealing ring by means of the universal VW 771 tool and VW 771/37 stripper.
Clear a carving of nuts.
Installation
Fill space between working and antidust edges of consolidation half plastic A1 G 052 128 greasing.
Press a new sealing ring against the stop, thus not to warp its
(fig. 3.112)
.
Establish a flange of a shaft of selection of capacity.
New sealing ring of round section to moisten in transmission oil and establish
(fig. 3.119)
.
Grease a carving of new nuts with a varnish for Loctite 648 fixing.
New nuts of a flange of a shaft of selection of capacity twirl with the inhaling moment
(fig. 3.118)
.
Fix nuts on the provided places (for example, an opravka).
In drawing fixing of nuts on a flange of a shaft of selection of capacity / the back driveshaft
(fig. 3.120) is represented
.
Establish the forward driveshaft.
Check level of transmission oil in a transfer case
Inhaling moment: nuts of a flange of a shaft of selection of capacity to a shaft of selection of capacity of 130 N · m
|
< |