VW Touareg repair


+ 1. Operation and car maintenance
- 2. Engine
   + Preliminary checks on the car
   - Mechanical part (petrol engines 3,2L)
      Removal of the power unit
      Removal and installation of the left and right pillows of a support of the engine
      Removal and installation of a conducted disk
      Removal and epiploon installation from a flywheel
      Replacement of an epiploon of a cranked shaft on the party of a damper of krutilny fluctuations
      Replacement of a sealing flange of a cranked shaft on the party of a damper of krutilny fluctuations
      Removal and installation of a cranked shaft
      Removal and installation of a lateral cover
      Removal and installation of a cover of a head of the block of cylinders
      Removal and installation of a head of the block of cylinders
      Check of phases of a gazoraspredeleniye
      Adjustment of phases of a gazoraspredeleniye
      Removal of cam-shafts
      Installation of cam-shafts
      Check of axial shift of cam-shafts
      Marking of cam-shafts
      Replacement of maslosjemny caps
      Check of directing plugs of valves
      Processing of saddles of valves
      Sizes of valves
      Check of pistons, piston rings and diameter of the cylinder
   + Mechanical part (petrol engines 4,2L)
   + Mechanical part (diesel engines 5,0L)
   + Removal and stretcher installation
   + pressurization System (diesel engines)
   + cooling System (petrol engines)
   + cooling System (diesel engines)
   + greasing System (petrol engines)
   + greasing System (diesel engines)
   + injection System (petrol engines)
   + injection System (diesel engines)
   + System of production of the fulfilled gases
   + System топливоподачи (beninovy engines)
   + Tables
+ 3. Transmission
+ 4. Running gear
+ 5. Steering mechanism
+ 6. Brake system
+ 7. Onboard electric equipment
+ 8. Body
+ electric equipment Schemes



Volkswagen Touareg / Touareg repair>> Engine>> Mechanical part (petrol engines 3,2L)>> Removal and installation of a cover of a head of the block of cylinders
Removal
After installation it is necessary to establish again all fixing elements of cables which are removed or cut off at dismantle.
Remove engine covers.
Remove ignition coils with target cascades.
Remove a sleeve between a flowmeter of G70 air and the module of management of a butterfly valve.
To disconnect the 6-contact tip from the module of management of a butterfly valve of J338, and also the 2-contact tip from the electromagnetic valve of 1 absorber with N80 absorbent carbon and the valve of ventilation of a case of the engine.
Disconnect vacuum hoses 1–3 from an inlet collector. On cars with an alphabetic reference of the BAA and BMX engine in addition remove a vacuum hose 4 from an inlet collector.

Fig. 2.56 . Fixing bolt of a support of an inlet collector


Unscrew a fixing bolt of the 5th support of an inlet collector (fig. 2.56) .
Then turn off fastening of an inlet collector at the left and on the right on a collector.
Disconnect a hose of ventilation of a case of the engine from GBTs cover.

Fig. 2.57 . Fixing bolts of an inlet collector


Turn off fixing bolts 1 and 2 on an inlet collector (fig. 2.57) .
Disconnect a vacuum hose from a vacuum drive of switching of an inlet collector.
Turn off an inlet collector from a head of the block of cylinders.
Remove an inlet branch pipe and put it on a pure surface so that not to damage an element of a vacuum drive.

NOTE
Inlet channels in an inlet collector and in a head of the block should be closed pure rags.

In front on a cover of GBTs turn off the holder for wires to the sensor of a detonation of 1 G61 and the sensor of level and G266 oil temperatures.
Uncover heads of the block of cylinders.

Installation
Installation is carried out in return sequence, taking into account the following features.
The inlet collector should be fastened to GBTs at first.
Then to tighten both bolts of the thermal screen and bolts of a prop of an inlet branch pipe.
Check density of fastening of fuel hoses.

Inhaling moments


<