VW Touareg repair


+ 1. Operation and car maintenance
+ 2. Engine
- 3. Transmission
   + 6-step automatic transmission 09D
   - Hydrotransformer check
      Liquid pumping from the hydrotransformer
      Hydrotransformer installation
      Repair of a drive of gear shifting
      Removal and installation of the handle of the selector
      Check and adjustment of draft of the selector
      Removal and installation of draft of the selector
      Removal and slip installation
      Removal and frame installation
      Removal and installation of an electromagnet of blocking of the N110 selector
      Removal and installation of the switch of the selector (the lever is blocked in the situation "P") F319
      Removal and installation of a drive of gear shifting
      Removal and transmission installation, cars with the diesel R5 engine
      Removal and transmission installation, cars with petrol V6 and V8 engines, turbodiesel engines V6 TDI, V10 TDI and the petrol W12 engine
      Inhaling moments
      Removal and installation of highways and ATF radiator
      Removal and installation of the control unit of an automatic transmission of J217
      Replacement of a sealing ring of a secondary shaft
      Removal and installation of the oil pallet
      Removal and installation of the mesh oil filter
      Removal and installation of the sensor of pressure for hydrosystem 1 in AKP G193 and the pressure sensor for hydrosystem 2 in AKP G194
      Removal and installation of a zolotnikovy box
      Removal, installation and adjustment of the multipurpose F125 switch
   + Mechanical transmission 08D and transfer case Е473
   + Driveshaft
   + Driving mechanism
   + Tables
+ 4. Running gear
+ 5. Steering mechanism
+ 6. Brake system
+ 7. Onboard electric equipment
+ 8. Body
+ electric equipment Schemes



Volkswagen Touareg / Touareg repair>> Transmission>> Hydrotransformer check>> Removal and installation of the switch of the selector (the lever is blocked in the situation "P") F319
NOTE
The Tiptronic-F189 switch – is built in a plait of wires of two electromagnets.

Removal
Remove the selector handle.
It is necessary to observe sequence of shutdown of joint stock bank surely.
Disconnect the mass plug from joint stock bank at the switched-off ignition.
Remove an overlay of the central console.

Fig. 3.22 . Bolts of the central console


Unscrew bolts of the central console (fig. 3.22) .
Unblock and disconnect shtekerny connection 1.
Unscrew a bolt 2 and remove the holder.

Fig. 3.23 . Shtekernye connections and bolt


Take shtekerny connection 3 of the holder (fig. 3.23) .
Disconnect shtekerny connections from electromagnets.

Fig. 3.24 . Lock lever


Press the lock lever to the right and pull the switch up-forward from a gear shifting drive (fig. 3.24) .

Installation
Installation is carried out in return sequence. Thus it is necessary to consider the following.

Fig. 3.25 . Cables: 1–a plait of wires to an electromagnet of blocking of the N110 selector; 2–a plait of wires to an electromagnet of blocking of the selector in the situation "P" N380; 3–a plait of wires to the selector switch (the lever is blocked in the situation "P") F319


To lay cables 1–3 how it is shown in drawing (fig. 3.25) .
Establish shtekerny connection 3 in the holder.
Tighten a bolt 2.
Connect the tip 1 (fig. 3.23) .
Establish an overlay of the central console.
Connect joint stock bank.
Establish the selector handle.


<