VW Touareg repair+ 1. Operation and car maintenance + 2. Engine - 3. Transmission + 6-step automatic transmission 09D - Hydrotransformer check Liquid pumping from the hydrotransformer Hydrotransformer installation Repair of a drive of gear shifting Removal and installation of the handle of the selector Check and adjustment of draft of the selector Removal and installation of draft of the selector Removal and slip installation Removal and frame installation Removal and installation of an electromagnet of blocking of the N110 selector Removal and installation of the switch of the selector (the lever is blocked in the situation "P") F319 Removal and installation of a drive of gear shifting Removal and transmission installation, cars with the diesel R5 engine Removal and transmission installation, cars with petrol V6 and V8 engines, turbodiesel engines V6 TDI, V10 TDI and the petrol W12 engine Inhaling moments Removal and installation of highways and ATF radiator Removal and installation of the control unit of an automatic transmission of J217 Replacement of a sealing ring of a secondary shaft Removal and installation of the oil pallet Removal and installation of the mesh oil filter Removal and installation of the sensor of pressure for hydrosystem 1 in AKP G193 and the pressure sensor for hydrosystem 2 in AKP G194 Removal and installation of a zolotnikovy box Removal, installation and adjustment of the multipurpose F125 switch + Mechanical transmission 08D and transfer case Е473 + Driveshaft + Driving mechanism + Tables + 4. Running gear + 5. Steering mechanism + 6. Brake system + 7. Onboard electric equipment + 8. Body + electric equipment Schemes |
Volkswagen Touareg / Touareg repair>> Transmission>> Hydrotransformer check>> Removal and installation of the control unit of an automatic transmission of J217
Removal
Before removal of the control unit of an automatic transmission of J217 it is necessary to request at first identification data of blocks management and the coding of the old control unit.
Clamps And cling to a cross-section extension under a seat. Slightly press a slip down and at the same time shift it back. Hold a slip in this situation and with clamps And pull it up to unblock.
Clamps In will get to grooves in a cross-section extension before a seat. Unblock them it is possible also, having pressed down and having pulled forward.
Clamps With заклипсованы in a lateral overlay of a seat, having pulled them forward, a slip it is possible расклипсовать.
Establish a seat in back, top situation.
Unblock «A» clamps in pressing down and simultaneous moving back. In such situation to hook a slip in the field of «A» clamps.
Press a slip down and at the same time pull it forward. Clamps of "B" and «C»
(fig. 3.63) will thus be unblocked
.
Establish a seat in forward, top situation.
It is necessary to observe sequence of shutdown of joint stock bank surely.
Disconnect the mass plug from joint stock bank at the switched-off ignition.
In the case 1 there is a control unit of an automatic transmission of J217 and the control unit of a transfer case of J646.
Unblock and disconnect tips of the control unit of a transfer case J646 2 and the tip of the control unit of an automatic transmission J217 3
(fig. 3.64)
.
Unscrew a bolt 1 and take the case with control units from fastening
(fig. 3.65)
.
Pull clamps outside 1 and take the control unit from the case 2
(fig. 3.66)
.
Installation
Installation is carried out in return sequence. Thus it is necessary to consider the following.
Check the old coding and code the new control unit.
Establish a seat covering.
To carry out working operations after joint stock bank connection.
|
< |